Sizewell Hall

A Special Place by the Sea

Archive for March, 2007

Lift Completed

Posted by Peter Warnock on 16th March 2007

Breaking news!  At last the platform lift is installed.  After months of planning and weeks of very hard work the lift is now in and working.  A few pictures to help you envisage some of the work we have completed.

SV2007391.JPG

Picture is taken from the kitchen door looking to the dishwasher room. 

Lift Area

The phone in relation to the lift.
SV200740.JPG

Picture of the lift on the second floor, taken outside bedroom 24.

Lift 1
Picture taken to show the inside of the lift.
Lift 3

 

Posted in News | 2 Comments »